Consistent, Scheduled Concrete Supply for Projects That Demand Precision
Ready-mix concrete delivery plays a critical role on projects where timing, consistency, and coordination matter. For large pours, structural placements, and jobs that require predictable batching, ready-mix concrete provides a dependable solution when the scope and specifications are clearly defined.
Bathurst Ready Mix supplies ready-mix concrete across Toronto and the Greater Toronto Area, supporting residential, commercial, industrial, and municipal projects that require steady delivery flow and uniform mix performance.
WHAT READY-MIX CONCRETE IS USED FOR
Ready-mix concrete is commonly selected for projects where quantities, mix designs, and placement schedules are established in advance. These include:
Structural slabs and foundations
Commercial and industrial floor systems
Municipal road and infrastructure work
Large residential builds
Warehouse pads and loading areas
Retaining walls and reinforced concrete elements
This delivery method allows crews to focus on placement and finishing while maintaining consistency throughout the pour.
Serving All of Toronto & Surrounding Areas
We proudly deliver across the Greater Toronto Area, including:
READY-MIX FAQ
What is ready-mix concrete?
Ready-mix concrete is a pre-measured, pre-blended mix of water, cement, and aggregate, delivered fresh and ready to pour.
Can you deliver on weekends?
Yes! We offer 7-day delivery across the GTA with advance notice.
What’s the difference between ready-mix and volumetric concrete?
Ready-mix is pre-batched, while volumetric concrete is mixed on-site, allowing for multiple mix types in one delivery.
How much does ready-mix concrete cost per cubic meter in Toronto?
The cost of ready-mix concrete in Toronto typically ranges from $230 to $250 per cubic meter, depending on the mix strength (MPa), additives, and delivery distance. At Bathurst Ready Mix, you only pay for what you use, minimizing waste and cost.
How long does ready-mix concrete stay workable after delivery?
Ready-mix concrete generally remains workable for 60 to 90 minutes after mixing, depending on temperature and additives. Because our trucks mix concrete on-site, you get extended workability and reduced risk of premature setting.
Can I pour ready-mix concrete in cold or hot weather?
Yes, but precautions are required. In hot weather, we use retarding admixtures to prevent quick setting. In cold weather, we offer heated water and high-early strength mixes to ensure proper curing. Our experts can help plan your pour for any season.
Do I need a concrete pump for my ready-mix delivery?
For hard-to-reach areas or large pours, a concrete pump may be needed. Bathurst Ready Mix can coordinate with trusted local pump providers to ensure a smooth and efficient pour.
CALL US FOR A QUOTE
Planning a project that requires ready-mix concrete delivery?
Speak with our team to confirm mix requirements, delivery timing, and site coordination.




